AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Dredging on caswll beach 2018 facebook9/26/2023 Every five to seven years the Army Corps of Engineers hires a contractor to pump in sand to replace what has eroded away.īut a once-brushed-over provision of the project that the Army Corps is now emphasizing puts the Sand Key project in doubt. Storms move the tide in and suck sand back offshore.Īlong a 9-mile stretch of Pinellas County, the federal Sand Key Shore Protection Project provides a lifeline for the shrinking beaches from just south of the Clearwater Pass to the northern tip of Redington Beach. ![]() It flows into inlets and piles up next to jetties. Sand moves quickly along the Pinellas County coast. “Before they started beach renourishment, our beach was no longer than there,” said Kennedy, the mayor of Indian Rocks Beach. She stopped before the sand and pointed to an inner portion of the dune, parallel to the beginning of the boardwalk that leads to the beach. INDIAN ROCKS BEACH -Joanne “Cookie” Kennedy left her hair salon, walked across Gulf Boulevard and onto the Indian Rocks Beach shoreline.
0 Comments
Read More
Leave a Reply. |